Unfortunately, this job posting is expired.
Don't worry, we can still help! Below, please find related information to help you with your job search.
Don't worry, we can still help! Below, please find related information to help you with your job search.
Related keywords
Some similar recruitments
Document Control Lead Jobs
Recruited by Luster National 8 months ago
Address New York, NY, United States
Qa Document Control Specialist
Recruited by Tri Pac, Inc. 8 months ago
Address South Bend, IN, United States
Document Control Representative Jobs
Recruited by Vanguard EMS 8 months ago
Address Beaverton, OR, United States
Construction Control Representative Jobs
Recruited by Arizona Department of Economic Security 8 months ago
Address Page, AZ, United States
Document Control Specialist Jobs
Recruited by LinxAI 8 months ago
Address Boston, MA, United States
Administrative Assistant/Document Control Clerk
Recruited by Robert Half 8 months ago
Address Honolulu, HI, United States
Administrative And Document Control Professional
Recruited by Jacobs 9 months ago
Address , Orlando, 32815
Senior Manager, Document Control
Recruited by Fluor Corporation 9 months ago
Address , Morrisville
$111,500 - $200,500 a year
Document Control Lead Jobs
Recruited by UMD ENERGY SOLUTIONS 9 months ago
Address Houston, TX, United States
Construction Data Center Manager
Recruited by AllSTEM Connections 9 months ago
Address Dallas-Fort Worth Metroplex, United States
Document Control Manager Jobs
Recruited by Synopsys 9 months ago
Address , Mountain View
$111,000 - $194,000 a year
Document Control Supervisor Jobs
Recruited by AECOM 9 months ago
Address , San Francisco
$69,000 - $120,000 a year
Document Control Manager - Data Center Construction
Company | Faith Technologies Inc. |
Address | , |
Employment type | FULL_TIME |
Salary | |
Expires | 2023-07-20 |
Posted at | 1 year ago |
A position at FTI can be the answer to your future career. In this role, you’ll be part of a progressive national leader in electrical planning, engineering, technology and energy services. FTI enables employee growth and success through industry-leading training and development, utilization of the latest industry technologies, and an uncompromised focus on safety. We recognize and reward top performers, offering competitive, merit-based compensation, career path development and a flexible and robust benefits package that boasts everything from paid training and tuition reimbursement to an award-winning wellness program.
The QA/QC Document Control Manager I provides overall management to the project document control requirements. Oversees the development and maintenance of project document system in accordance with client requirements. Ability to read and comprehend project specifications, submittals, and construction drawings.
MINIMUM REQUIREMENTS
Education: A high school diploma or GED or An Associates Degree
Experience: Three to five years of administrative experience
Preferred Experience: Five years of administrative experience or three years field experience in construction trades
Travel: Up to 25%
Work Schedule: This position works between the hours of 7 AM and 5 PM, Monday- Friday. Overtime may be required. However, work may be performed at any time on any day of the week to meet business needs.
KEY RESPONSIBILITIES
- Coordinates the flow of documents between project Preconstruction Managers, engineering, Quality and Commissioning, field construction team, and other departments.
- Assists in the creation of process documentation with the assistance of process and site subject matter experts.
- Utilizes company software to generate and update project reports, checklists, and other documents as required by the project.
- Assists the project team with maintaining documents and project closeout.
- Updates and maintains project document control programs and software.
- Manages the timely distribution of latest revision level documentation.
- Manages the timely completion of project Quality and Commissioning documentation upload in project systems.
- Engages in all aspects of process improvement.
- Actively participates in Faith's hiring referral and mentoring program, as appropriate.
- Proofreads newly created documents for grammatical errors and proper formatting.
- Coordinates the development and distribution of project checklists, reports, and databases with the support of other Quality and Commissioning and document control team members.
- Assists in the creation of process documentation with the assistance of process and site subject matter experts.
- Performs other related duties as required and assigned.
- Maintains document control standards including version control.
- Performs clerical typing duties to generate/update documents, as necessary.
- Manages, maintains, and organizes project Quality and Commissioning document filing structure.
- Verify equipment/asset naming aligns with current construction drawings.
The job description and responsibilities described are intended to provide guidelines for job expectations and the employee's ability to perform the position described. It is not intended to be construed as an exhaustive list of all functions, responsibilities, skills and abilities. Additional functions and requirements may be assigned by supervisors as deemed appropriate.
SURGE your career forward!
Employees at FTI grow faster because they are a part of a nationally leading team of electrical planners, engineers, designers, electricians, and business professionals.
Employees at FTI grow faster because they are a part of a nationally leading team of electrical planners, engineers, designers, electricians, and business professionals.
- Leverage Technology: Our virtual design and build programs that offer the latest in robotic total stations, 3D scanning, virtual and augmented reality and drone surveillance and assessment.
- Uncompromised Safety: When we see others in our space averaging 2.7 safety rating and ours average .42, you know that we value you and your safety above all else.
- Your Personal Growth: Build your career path by taking advantage of our industry leading training and leadership development programs.
We offer competitive, merit-based wages; career path development and flexible and a robust benefits package that boasts everything from paid training, tuition reimbursement and a top-notch wellness program.
We pride ourselves on a “Ground up Growth” mentality that puts you in the spotlight. Becoming a member of the FTI team means you’ve officially put yourself in the driver’s seat of your career. Through our career development and continued education programs, you’ll have options to position yourself for success.
FTI is a “Merit to the Core” organization, and we pride ourselves on our ability to reward and recognize top performers.
BENEFITS ARE THE GAME CHANGER
FTI enriches the lives of its employees through industry-leading total rewards. Our compensation, benefits, time off, and wellness programs are designed to reward individual results that create team success, improve financial security for our employees and their families, and encourage healthy lifestyles. As an eligible employee*, your programs include:
FTI enriches the lives of its employees through industry-leading total rewards. Our compensation, benefits, time off, and wellness programs are designed to reward individual results that create team success, improve financial security for our employees and their families, and encourage healthy lifestyles. As an eligible employee*, your programs include:
- 401(k) Retirement & 401(a) Profit Sharing Plans
- Tuition Reimbursement
- And so much more!
- Medical, Dental, Vision, and Prescription Drug Insurance
- Flexible Spending and Health Savings Accounts
- Performance Incentives/Bonuses
- Company-Paid Life and Disability Insurance
- Award-Winning Wellness Program and Incentives
- Paid Time Off
- Regular/Full-Time Employees are eligible for FTI benefit programs.
We stand strong in our values as we work to Create World-Class Opportunities to Succeed through:
- REDEFINING what’s possible.
- Rewarding individual results that create TEAM SUCCESS.
- Building TRUST in everything we do.
- Uncompromised focus on keeping people SAFE.
If you’re ready to learn more about growing your career with us, apply today!
FTI is an Affirmative Action Employer/Equal Opportunity Employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity or national origin.
-
Systems Analyst - Excel, Xml, Sql, Scripting
By CyberCoders At Salt Lake City, UT, United States 8 months ago
-
(Senior) Finance & Shared Services Manager
By Catholics For Choice At Washington, DC, United States 8 months ago
-
Paralegal - Probate Administration
By CyberCoders At Miami, FL, United States 8 months ago
-
Account Executive - Automotive Software
By ECW Search At United States 8 months ago
-
Construction Project Coordinator Jobs
By CyberCoders At River Falls, WI, United States 8 months ago